205 NW 40th Street
Lincoln
NE

Frontier Harley Davidson

環境を配慮した建物
地熱エネルギー

このサイトについて

No votes yet

The building’s HVAC uses a high-efficiency, geothermal system engineered to reduce energy usage by 35%, low-flow toilets and faucets contributing to a 20% savings in water usage and 90% of the regularly occupied areas in the dealership
utilize natural daylight and have views to the outside. For the artificial lighting that is required, energy-saving Energy Star fixtures were used.

The commissioning aspect of the project begins at the early stages of design and continues until the project is successfully completed and accepted by the Owner. Documentation during pre-design, design and completion of the installation is vital. The pre-design phase notes primary issues that are important to the Owner and the design phase implements these issues into the bid document specifications. The startup and testing of a project is vital to successful operation. Including plant operators during this process assures that when problems occur after the project is completed, trouble-shooting by plant personnel is more productive and produces better results.

Location:

Javascript is required to view this map.

コメント

コネクション

ここでは、関連したサイトと比較、地図の探索、ボランティアについてやこのサイトへの行きかたなどがわかります。

行きかた

Contacts

このグリーンサイトと同じ第一アイコンを指定しているサイトは自動的にここに表示されます。ここに表示されているほかのサイトを見て比較してみよう。
世界中の関連サイト
Choose a connections category from the list on the left.

マルチメディア

Registered users can post photos, videos, and documents here.

インパクト

まだ誰からもインパクトは報告されていません!一番目になりませんか?

Donate to GreenMaps