Eastlake Service Yard Bio-retention cell Demonstration
![친환경 기술: 재생가능하고 대체 또는 다른 지속가능한 기술이 가능한 지역. 청정 기술, 무공해, 청정 에너지, 새롭고 적합한 기술 지역을 포함할 수 있음. 친환경 산업 단지, 저기술 계획, 조사 및 관련 단체와 자금조성자원에 이 아이콘 사용가능.
친환경 기술](https://www.opengreenmap.org/sites/default/files/taxonomy_image/category_pictures_27.gif)
![수자원 재활용 * 물 재활용
: 수중동물, 토양, 활동, 습지대를 이용하거나 화학적 첨가물 없이 물을 정화함. 자연속에 설치된 배수시설, 빗물 정원을 이용한 장기적 시스템, 그리고 물 소비를 줄이는 다른 다양한 기술의 수자원 재활용 시스템을 포함한다.
수자원 재활용 * 물 재활용](https://www.opengreenmap.org/sites/default/files/taxonomy_image/category_pictures_20.gif)
개요
Project Number #10SWIF-151
Est. Project Completion December, 2010
SubGrantee City of Eastlake 35150 Lakeshore Blvd. Eastlake, Ohio 44095
Project Contact: Mike Semik, Service Director City of Eastlake
Amount Awarded: $64,479
Project Title: Eastlake Service Yard Bio-retention Demonstration
Project Location: City of Eastlake
Watershed: Chagrin River
Project Summary: $64,479 in Surface Water Improvement Fund (SWIF) grant funding is awarded to the city of Eastlake to install 2 bio-retention cells to treat and reduce runoff from the City of Eastlake’s Service Yard. The city will install 2 bio-retention cells totaling 2,700 square feet in areas where there are currently no stormwater management controls in place. This project will serve to demonstrate to local developers, residents and municipal and township service garages in the Lake and surrounding counties that innovative stormwater retrofits can easily be incorporated into service yards and existing parking areas. The project will be supported by education and outreach activities such as the installation of a sign about the project at the entrance and public recycling areas, developing and distributing a project-specific brochure, a webpage addition and a project specific newsletter article in the city’s newsletter.
This project is being implemented consistent with the recommendations in the state endorsed Chagrin River Watershed Action Plan. It is also generally consistent with findings and recommendations within the Chagrin River Total Maximum Daily Load study completed by Ohio EPA and approved by US EPA.
Project Deliverables: Installation of 2,700 square feet of bio-retention cells within the city of Eastlake’s Service Yard. Conduct education and outreach activities including the development and installation of 2 project specific signs, creation and distribution of a project-specific pamphlet, 1 newsletter articles and a project-specific addition to the city’s website. Additionally, 1 project-specific presentation will also be made to the Board of the Chagrin River Watershed Partners, the city of Eastlake City Council and to the Lake County Mayors and City Managers Association.
Environmental Results: Successful completion of this project will passively treat stormwater drainage, reduce nonpoint source pollution loadings to the Chagrin River and demonstrate alternative methods of stormwater management for area developers and local officials.
Location:
댓글
Connections
- Cleveland
- Cleveland
- North Olmsted
-
- Glenwill
-
-
- Mentor
-
- Barberton
- Cape Town
- Australia
- SalemUnited States
- London
- United Kingdom
- KarlskronaSweden
- KarlshamnSweden
- GainesvilleUnited States
- JacksonvilleUnited States
- Kallinge
- Singapore
- seoul대한민국
- BrooklynUnited States
- DurbanSouth Africa
- seoul대한민국
- BrooklynUnited States
- seoul대한민국
- RichmondUnited States
- RichmondUnited States
- FlorianópolisBrazil
-
- New YorkUnited States
- VilniusLithuania
- RichmondUnited States
- Spain
Multimedia
Impacts
No impacts have been left for this site yet - be the first!