Venice Beach

101 The Esplanade
Venice
FL 34285

Venice Beach

水域/河边 公园公园/公共森林/自然区域沿海生物栖息地水生动物栖息地游泳生态景观生态旅游资源日出/日落赏区

概览

No votes yet

The first of five renourishments to take place over the next 50 years at Venice Beach was completed in 2005. The Army Corps of Engineers project added between 130 - 160 feet of sand seaward. Click here for the link to the beach renourishment PDF

The original beach nourishment took place in two phases in 1994 and 1996. The federally funded beach project added 250 feet of sand seaward from the north jetty to south of the Municipal Fishing Pier with the intention of having 150 feet left above water after the first several storms came through.

Some of that sand went under water as was hoped, to break wave action against the shoreline. Other sand has been washed away from the system.

Amenities: Parking, food concession, shelter, two sand volleyball courts, picnic area and boardwalks.

Location:

Javascript is required to view this map.

评论

Connections

Compare related sites, explore the related maps, find out about volunteering, how to get here and more. Soon, you will find ways to share this map here, too.

Getting Here

Every site using the same primary Icon on Open Green Map is automatically linked here. You can compare different approaches and solutions on this map and others around the world.
Related Sites Worldwide
Choose a connections category from the list on the left.

Multimedia

Registered users can post photos, videos, and documents here.

Impacts

No impacts have been left for this site yet - be the first!

Donate to GreenMaps